Commercial SectorQuality Control

Havercroft – Blackpole Retail Park – Quality Control Survey

Overview

Carré Consultancy was engaged by Havercroft Construction Ltd to undertake a Quality Control (QC) survey during the roof and cladding refurbishment works at Units 2 and 3, Blackpole Retail Park, Worcester.

The project scope involved the overcladding of existing composite roof panels, replacement of gutter systems, and installation of new signage canopies. Our inspection formed part of the project’s assurance process, verifying compliance with manufacturer standards, workmanship quality, and adherence to design intent.

Havercroft - Blackpole Retail Park – Roof Refurbishment - Quality Control Survey


Key Numbers
& Stats:

Project

Roofing and Cladding Quality Control (QC) Survey

Client

Havercroft Construction Ltd

Consultant

Carré Consultancy Ltd


System

Euroclad 32/1000R steel roof overclad with Weatherfast membrane-lined gutters

Sub-Contractor

DB Industrial Roofing Ltd

Challenge

The primary challenge involved assessing the installation of a complex overclad roofing system while maintaining compliance with building control requirements despite the omission of new insulation. Additional risks related to inconsistent use of vapour control layers and butyl tapes, potential for water ingress, and ensuring workmanship met expected tolerances. The site also presented logistical considerations—ongoing installation activities and environmental sensitivities, including nesting birds protected under the Wildlife and Countryside Act 1981.

Solution

Carré Consultancy conducted a detailed on-site inspection supported by photographic documentation and cross-referenced against Euroclad installation guidance. The inspection covered sheet alignment, fixing quality, sealing details, and interface conditions at ridges, gutters, and abutments. Our report provided technical commentary and practical remedial advice, including:-

  • Confirmation of acceptable workmanship and alignment of fixings using string lines
  • Recommendations to double the butyl tape application at laps for improved vapour resistance
  • Advice on sealing and riveting redundant fixing holes and repairing impact damage to maintain coating integrity
  • Guidance on suitable remedial strategies for trimmed composite panels and abutment flashings
  • A reminder to review building control approvals for insulation omissions

Outcome

Our inspection concluded that the roofing works were of generally good quality, with isolated workmanship issues addressed promptly by the contractor. The structured inspection process ensured early identification and rectification of potential weatherproofing defects, safeguarding long-term roof performance. Carré’s clear technical reporting, constructive collaboration with DB Industrial Roofing and Havercroft Construction, and proactive communication strengthened site quality control and client confidence.

This project demonstrates Carré Consultancy’s value in delivering expert, independent verification of roofing and cladding installations — ensuring compliance, durability, and safety across commercial refurbishment schemes.

  • Project Scope

    A Quality Control (QC) survey during the roof and cladding refurbishment works.

  • Project Scope

    A Quality Control (QC) survey during the roof and cladding refurbishment works.

  • Project Scope

    A Quality Control (QC) survey during the roof and cladding refurbishment works.



Contact Carré





    By submitting your details, you agree to our data processing practices.


    Find Us